Our pursuit and enterprise goal is to "Always satisfy our customer requirements". We keep on to establish and style and design outstanding top quality goods for both our outdated and new prospects and realize a win-win prospect for our clientele likewise as us for Hdpe Pipe Bends, Hdpe Fittings, Hdpe Plastic Pipe, All products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. Welcome customers new and old to contact us for business cooperation.
China Wholesale Gas Poly Pipe Fittings Factory – HDPE Ball Valve for Gas Supply PN16 SDR11 PE100 CE Approved – CHUANGRONG Detail:
Detail Information
Product Name: |
HDPE Ball Valve For Gas Supply PN16 SDR11 PE100 CE Approved |
Application: |
Gas,Water,Oil Etc |
Specification: |
50mm~315mm PE100 PN16 SDR11 |
Standard: |
EN 1555-3:2010 EN 12201-3:2011 |
Port: |
China Main Port |
Material: |
PE100 Virgin Raw Material |
Product Description
ProductDescription of Standard HDPE Ball Valve for GAS Supply
Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together: Afterelectrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.
Specification
Specifications
φdn
|
L
mm |
A
mm |
H
mm |
φd |
50 |
495 |
90 |
200 |
41 |
63 |
505 |
100 |
200 |
49 |
90 |
660 |
110 |
325 |
70 |
110 |
660 |
115 |
325 |
87 |
160 |
770 |
115 |
420 |
126 |
200 |
785 |
125 |
430 |
158 |
250 |
980 |
140 |
585 |
204 |
315 |
985 |
140 |
585 |
250 |
Application
1.Municipal water supply, gas supply and agriculture etc.2.Commercial & Residential water supply3.Industrial liquids transportation4.Sewage treatment5. Food and chemical industry7. Replacement of cement pipes and steel pipes8. Argillaceous silt, mud transportation9. Garden green pipe networks.

Factory Test report
est item |
Standard |
Conditions |
Results |
Unit |
1.Melt Flow Index |
ISO1133 |
190°C & 5.0Kg 0.2-0.7 |
0.49 |
g/10min |
2.Density |
ISO1183 |
@23°C ≥0.95 |
0.960 |
g/cm3 |
3.Oxidation Induction Time |
ISO11357 |
210°C >20 |
39 |
Min |
4. Hydrostatic Pressure Test |
ISO1167 |
80°C 165h, 5.4Mpa |
Passed |
|
5 Size Check |
ISO3126 |
23°C |
Passed |
|
6 Appearance |
Clean& Smooth |
23°C |
Passed |
|
- The results according to test 1-3 are taken form the PE raw material supplier’s report.
- The results according to test 4-6 are taken from the internal test results of fittings sampled from the
- same batch as delivered fittings.
- Marking according EN 12201 – 3 and EN 1555 – 3.
- The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.
Workshop
Certifications

Application

Product detail pictures:
Related Product Guide:
We have a professional, efficiency team to provide quality service for our customer. We always follow the tenet of customer-oriented, details-focused for China Wholesale Gas Poly Pipe Fittings Factory – HDPE Ball Valve for Gas Supply PN16 SDR11 PE100 CE Approved – CHUANGRONG , The product will supply to all over the world, such as: Sao Paulo, Tanzania, Sri Lanka, If you are interested in any of our products and solutions or would like to discuss a custom order, remember to feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.