Attaining consumer satisfaction is our firm's purpose for good. We'll make wonderful efforts to produce new and top-quality merchandise, meet up with your special necessities and supply you with pre-sale, on-sale and after-sale products and services for Clamppipe Leak Repair, Sdr33 Hdpe Pipe, Pe100 Sdr11 Pipe, Our highly specialized process eliminates the component failure and offers our customers unvarying quality, allowing us to control cost, plan capacity and maintain consistent on time delivery.
China Wholesale Electrofusion Fittings Prices Factories – Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG Detail:
Detail Information
| Product Name: |
Electrofusion HDPE Fittings End Cap For Water And Gas Supply PN16 SDR11 PE100 |
Specification: |
32mm~110*mm PE100 PN16 SDR11 |
| Standard: |
EN 12201-3:2011,EN 1555-3:2010 |
Application: |
Gas,Water,Oil Etc |
| Material: |
PE100 Virgin Raw Material |
Port: |
China Main Port |
Product Description
Electrofusion HDPE Fittings End Cap for Water and Gas supply PN16 SDR11 PE100
Production Description of Electrofusion HDPE End Cap
Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together:
After electrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.
Specification
| Specification
φD |
L |
A |
φd |
| 32 |
60 |
45 |
4.7 |
| 40 |
70 |
55 |
4.7 |
| 50 |
70 |
55 |
4.7 |
| 63 |
80 |
55 |
4.7 |
| 90 |
95 |
55 |
4.7 |
| 110 |
105 |
70 |
4.7 |
Details
| Products name |
Electrofusion HDPE End Cap |
| Sizes Available |
As below specification sheet in detail |
| SDR |
SDR11,SDR17 |
| PN |
PN16,PN10 |
| Material Brand |
SINOPEC, BASELL, SABIC, BOROUGE etc |
| Executive Standard |
EN 12201-3:2011,EN 1555-3:2010 |
| Colors Available |
Black color , blue color, Orange or as request. |
| Packing Method |
Normal export packing. by carton |
| Production Lead Time |
Depending on the order quantity.Normally about 2~3 weeks for 20′ GP, 3~4 Weeks for a 40′GP. |
| Certificate |
ISO, CE,BV,Factory Test Report |
| Supply Ability |
100000 Ton/Year |
| Payment Method |
T/T, L/C at sight |
| Trading Method |
EXW, FOB, CFR, CIF,DDU |
Factory Test report
| Test item |
Standard |
Conditions |
Results |
Unit |
| 1.Melt Flow Index |
ISO1133 |
190°C & 5.0Kg 0.2-0.7 |
0.49 |
g/10min |
| 2.Density |
ISO1183 |
@23°C ≥0.95 |
0.960 |
g/cm3 |
| 3.Oxidation Induction Time |
ISO11357 |
210°C >20 |
39 |
Min |
| 4. Hydrostatic Pressure Test |
ISO1167 |
80°C 165h, 5.4Mpa |
Passed |
|
| 5 Size Check |
ISO3126 |
23°C |
Passed |
|
| 6 Appearance |
Clean& Smooth |
23°C |
Passed |
- The results according to test 1-3 are taken form the PE raw material supplier’s report.
- The results according to test 4-6 are taken from the internal test results of fittings sampled from the
- same batch as delivered fittings.
- Marking according EN 12201 – 3 and EN 1555 – 3.
- The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.
Certifications
We can supply ISO9001-2008, BV ,SGS, CE etc certification.All kinds of products are regularly conducted pressure-tight blasting test,longitudinal shrinkage rate test, quick stress crack resistance test, tensile test and melt index test, so as to ensure the quality of products totally reach the relevant standards from raw materials to finished products.

Product detail pictures:
Related Product Guide:
We attempt for excellence, provider the customers", hopes to be the most beneficial cooperation team and dominator enterprise for staff, suppliers and shoppers, realizes value share and continuous advertising for China Wholesale Electrofusion Fittings Prices Factories – Water And Gas Supply HDPE Electrofusion Fittings , HDPE End Cap PN16 SDR11 PE100 – CHUANGRONG , The product will supply to all over the world, such as: Bangalore, Orlando, Birmingham, Strong infrastructure is the need of any organization. We are backed with a robust infrastructural facility that enables us to manufacture, store, quality check and dispatch our products worldwide. To maintain smooth work flow, we have sectioned our infrastructure into a number of departments. All these departments are functional with latest tools, modernized machines and equipment. Owing to which, we are able to accomplish voluminous production without compromising upon the quality.