Sticking towards the principle of "Super High-quality, Satisfactory service" ,We've been striving to become a superb business partner of you for Gas Poly Pipe Fittings, Pipe Repair Coupling, Pe Fittings, All products come with good quality and perfect after-sales services. Market-oriented and customer-oriented are what we have been being after. Sincerely look forward to Win-Win cooperation !
China Wholesale Electrofusion Fittings Manufacturer Factory – HDPE Ball Valve for Gas Supply PN16 SDR11 PE100 CE Approved – CHUANGRONG Detail:
Detail Information
| Product Name: |
HDPE Ball Valve For Gas Supply PN16 SDR11 PE100 CE Approved |
Application: |
Gas,Water,Oil Etc |
| Specification: |
50mm~315mm PE100 PN16 SDR11 |
Standard: |
EN 1555-3:2010 EN 12201-3:2011 |
| Port: |
China Main Port |
Material: |
PE100 Virgin Raw Material |
Product Description
ProductDescription of Standard HDPE Ball Valve for GAS Supply
Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together: Afterelectrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.
Specification
| Specifications
φdn
|
L
mm |
A
mm |
H
mm |
φd |
| 50 |
495 |
90 |
200 |
41 |
| 63 |
505 |
100 |
200 |
49 |
| 90 |
660 |
110 |
325 |
70 |
| 110 |
660 |
115 |
325 |
87 |
| 160 |
770 |
115 |
420 |
126 |
| 200 |
785 |
125 |
430 |
158 |
| 250 |
980 |
140 |
585 |
204 |
| 315 |
985 |
140 |
585 |
250 |
Application
1.Municipal water supply, gas supply and agriculture etc.2.Commercial & Residential water supply3.Industrial liquids transportation4.Sewage treatment5. Food and chemical industry7. Replacement of cement pipes and steel pipes8. Argillaceous silt, mud transportation9. Garden green pipe networks.

Factory Test report
| est item |
Standard |
Conditions |
Results |
Unit |
| 1.Melt Flow Index |
ISO1133 |
190°C & 5.0Kg 0.2-0.7 |
0.49 |
g/10min |
| 2.Density |
ISO1183 |
@23°C ≥0.95 |
0.960 |
g/cm3 |
| 3.Oxidation Induction Time |
ISO11357 |
210°C >20 |
39 |
Min |
| 4. Hydrostatic Pressure Test |
ISO1167 |
80°C 165h, 5.4Mpa |
Passed |
|
| 5 Size Check |
ISO3126 |
23°C |
Passed |
|
| 6 Appearance |
Clean& Smooth |
23°C |
Passed |
|
- The results according to test 1-3 are taken form the PE raw material supplier’s report.
- The results according to test 4-6 are taken from the internal test results of fittings sampled from the
- same batch as delivered fittings.
- Marking according EN 12201 – 3 and EN 1555 – 3.
- The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.
Workshop
Certifications

Application

Product detail pictures:
Related Product Guide:
We have state-of-the-art equipment. Our products are exported for the USA, the UK and so on, enjoying a fantastic status among the clients for China Wholesale Electrofusion Fittings Manufacturer Factory – HDPE Ball Valve for Gas Supply PN16 SDR11 PE100 CE Approved – CHUANGRONG , The product will supply to all over the world, such as: Stuttgart, Russia, Nicaragua, We also have the strong ability of integration to supply our best service, and plan to build the warehouse in the different countries around the world, that will probably be more conveniently to service our customers.